LENR-to-Market Digest -- October 25, 2015
Pure Energy Systems News
Sterling D. Allan
10/25/2015
Excerpt:
5 months recap includes: Independent confirmation of 1 MW E-Cat Plant, commercialization expected March 2016, focusing on manufacturing preparation; customers lining up, $3 billion in pre-orders; X Reactor; replications; new investors, 2.5 years due diligence; US patent awarded, international filed, trademark awarded; many academic publications.
It's been five months since I've done a digest. I'm just pulling from the leading source, E-CatWorld, spanning back to our last compilation on May 16. There are around 95 stories from them organized topically here.
Mainstream news sources are indicated ....
See also Cold Fusion Times.
......................................
View the complete article, including links, at:
http://pesn.com/2015/10/25/9602651_LENR-Digest.htm/
Pure Energy Systems News
Sterling D. Allan
10/25/2015
Excerpt:
5 months recap includes: Independent confirmation of 1 MW E-Cat Plant, commercialization expected March 2016, focusing on manufacturing preparation; customers lining up, $3 billion in pre-orders; X Reactor; replications; new investors, 2.5 years due diligence; US patent awarded, international filed, trademark awarded; many academic publications.
It's been five months since I've done a digest. I'm just pulling from the leading source, E-CatWorld, spanning back to our last compilation on May 16. There are around 95 stories from them organized topically here.
Mainstream news sources are indicated ....
See also Cold Fusion Times.
- LENR Companies
- Rossi, Leonardo Corp - E-Cat
- Running 1 MW Plant
- E-Cat Customer Happy With Energy Bills: Rossi (E-CatWorld; July 11, 2015)
- Norway’s Aftenposten Newspaper: Independent Confimation Rossi’s 1MW Plant Working (Source with ‘Heavy Scientific Background’ has Inspected Plant) (E-CatWorld; June 21, 2015)
- Long Term 1 MW Plant Test to help with Next Generation of E-Cat Industrial Plants (E-CatWorld; September 25, 2015)
- Rossi: We can Throttle the E-Cat Plant (E-CatWorld; September 5, 2015)
- Rossi: ‘Consolidated’ 1 MW E-Cat Plant to Have Volume of 4 Cubic Meters (E-CatWorld; October 18, 2015)
- Rossi: If Test Successful, E-Cat Commercialization to Start March 2016 (E-CatWorld; September 22, 2015)
- 1 MW E-Cat Plant Watch Thread [UPDATE #30: Rossi on Reactors and Repairs] (E-CatWorld; September 21, 2015)
- Independent Referee Collects ‘Only Data Deemed Valid’ From 1MW E-Cat (E-CatWorld; September 11, 2015)
- ‘No Time to be Lost’ in Bringing E-Cats to Market if Test is a Success (E-CatWorld; August 16, 2015)
- E-Cat Plant Test Reaches Half-Way Mark (E-CatWorld; August 14, 2015)
- Rossi on Reactor Repair (E-CatWorld; September 2, 2015)
- New Photo of E-Cat Plant Published (E-CatWorld; May 26, 2015)
- 1MW Plant and Hot Cat Continue Stable and Self-Sustaining: Rossi [Update: July 9, New data point] (E-CatWorld; July 5, 2015)
- Manufacturing
- Rossi on Production: ‘Unthinkable’ to Sell E-Cats Until Economy of Scale Reached (E-CatWorld; September 27, 2015)
- Rossi: Manufacturing, not Licensing is Focus for E-Cat (E-CatWorld; August 31, 2015)
- Rossi: Studying Use of ABB Collaborative Robots for E-Cat Production Line (E-CatWorld; September 27, 2015)
- Rossi Promises a Revolution in the Production System (Larry Jameson) (E-CatWorld; September 5, 2015)
- Rossi: Outsourcing for Production Arranged With Chain of Industries in US, Europe and Asia [Update: Confidential Parts to be Outsourced] (E-CatWorld; July 9, 2015)
- X Reactor
- E-Cat X Reactor Down Again, Rossi Still Very Optimistic (E-CatWorld; September 26, 2015)
- Rossi Working to Fit E-Cat X Within US Patent, Predicts 150 Patents Pending This Year (E-CatWorld; September 23, 2015)
- E-Cat X Light and Heat in Every House ‘Not Impossible’ (E-CatWorld; August 13, 2015)
- E-Cat X Fix Requires Making New Material that ‘Does not Exist in Commerce’ (E-CatWorld; August 20, 2015)
- Rossi Setting Up A ‘Make Materials That Don’t Exist’ Lab (Update: New Lab ‘in Miami’) (E-CatWorld; October 1, 2015)
- Rossi: E-Cat X ‘A Real Revolution . . . Very, Very, Very Good’ (Update #2 — AR Hopes for Home Heat and Power Next Year) (E-CatWorld; August 18, 2015)
- Replications
- Researchers at Institute of Nuclear Physics of Kazakhstan Report Excess Heat in Nickel-Hydrogen System (UPDATE: Correction to English Translation Received) (E-CatWorld; October 19, 2015)
- New Paper by Moscow State University Team Confirms Rossi and Parkhomov Experiments in Nickel-LAH System (Update: English Translation by Bob Higgins Available) (E-CatWorld; October 4, 2015)
- New Russian Parkhomov/E-Cat Replication Claim: COP over 3 at 1347C (Update: English translation from Peter Gluck) (E-CatWorld; August 1, 2015)
......................................
View the complete article, including links, at:
http://pesn.com/2015/10/25/9602651_LENR-Digest.htm/
Comment